By admin /

ULC is pleased to announce the publication of the Fifth Edition of CAN/ULC- S, Standard for. Inspection and Testing of Fire Alarm Systems. This National. Fire Alarm Inspection, Maintenance, and Service by Anubis Systems Technologies. SCOPE. This Standard provides requirements for the inspection and testing of fire alarm systems and specifies the devices and functions to be inspected.

Author: Fenrirn Zulkigar
Country: Colombia
Language: English (Spanish)
Genre: Medical
Published (Last): 16 August 2004
Pages: 341
PDF File Size: 17.88 Mb
ePub File Size: 11.68 Mb
ISBN: 596-6-62274-441-9
Downloads: 1008
Price: Free* [*Free Regsitration Required]
Uploader: Goltitaxe

Ensure that the fire alarm system is fully functional?

CAN/ULC-S | Standards Council of Canada – Conseil canadien des normes

Water discharge from all nozzles unimpeded? Catholic Umbrella Pool II.

The fire signal receiving centre is ULC Listed. There are a number of companies in the Lower Cqn that perform this service. Vancouver, Richmond, and Langleythe individuals performing annual testing must be registered by ASTTBC or certified by an agency recognized by the local authority. Operation of the fire signal receiving centre transmitter bypass means results in a specific I trouble indication at the fire alarm control unit or transponder Operation of the fire signal receiving centre disconnect means transmits a trouble signal to J the fire signal receiving centre.

In this instance the detectors are powered by a stand-by battery that will ensure continued protection even in the complete absence of electrical power or a “brown-out”.

Manual transfer from alert signal to alarm signal. Fire shutter release activated by fire alarm system?

Once a month or so, take your vacuum on it’s lowest setting and utilizing a soft brush attachment, clean out the vents of the detector. Gauges checked against ullc gauge or replaced? Output circuits for selective voice paging, including visual indication, F operates.

  BENZILPENICILINA BENZATINA BULA PDF

Will racks swing out of the cabinet at least ninety 90 degrees? Yes Last Service Date: Description of elevator homing functions activated by the fire alarm system. Refer to Appendix F1 ; P iii Silent accelerated test.

When sufficient particles accumulate, the unit goes into an alarm condition. All addressable devices must be individually listed on the Device Test Record sheet.

Where fault isolation in power distribution riser has been provided, tests have been conducted to ensure a wire-to-wire short in the field wiring between each pair of control units or transponders, in C turn, results dan annunciation of the fault and continued operation outside of the shorted section confirmed. Test batteries for specific gravity and state of charge?

These are the units that provide an interconnection to conventionally wired devices like manual pull stations, sprinkler isolation valves, flow switches, low air and the like; If your system employs a UDACT communicator, the technician must ensure that appropriate signals generated by the system during the testing must be received at the monitoring station; Field addressable relay modules must be listed on the Individual Device Test Recordand their locations and function documented.

Yes No NA Belt checked ilc proper tension? Hose Connection Pressure Reducing Valves: Latches functional including break-glass type? All sprinkler pressure regulating control valves passed full flow test? Backflow prevention assembly shall be tested at the design flow. Interior of dry pipe valve shall be inspected at time of trip test? V Visual indicator test lamp test operates. Heat detectors whose labels are missing, faded and unreadable, or painted are considered failed and require replacement.

Cqn signal silence visual indicator operates. Yes No Time for motor to accelerate to full speed: Required Building Code Alarm Operation: Where fault isolation modules are installed in data communication links serving field devices, wiring shorted on the isolated side, annunciation of the fault confirmed, and then a device on the source side operated, czn activation confirmed at the control unit or transponder. Multi-line sequential display operates as per Appendix C5.

  ESBI QUADRANT PDF

System in service on inspection? Obstructive material discharged during water flow tests? Alarm device, test on dry pipe, pre-action or deluge system using bypass? Supporting field devices must also be listed. Heat Tracing – check pipe insulation for cuts or abrasions. Fire Alarm System Inspection Services.

Standards Council of Canada

Have someone standing by upc panel so that they can cancel or silence any audible alarm quickly. The printed maintenance and testing guide must be followed.

Coded signal sequences operate not less than the required number of times and the W correct alarm signal operates thereafter. Alarm valves shall be inspected externally. All daily, weekly, monthly, and quarterly inspection and testing items on this form shall be done during the Annual Inspection.

There is fire protection equipment located at the above referenced address that has not been tested in accordance with the NO Provincial Fire Code. Most fire alarm systems employ zoned annunciators so that fire fighting personnel can be dispatched to the proper area of the building.

Tests to be done every a536 year: Alarm valve free from damage, trim in correct position, and no leakage? Alarm devices inspected to verify they are free cann physical damage? Visible signaling appliances tested?